Skip to main content

Presidio Trust Library

The Presidio Trust

Reports and Plans from the Presidio Trust Library

117
RESULTS
rss


texts texts 117

PART OF
American Libraries

TOPIC atoz
environmental remediation 71
soil contamination 50
groundwater contamination 40
petroleum contamination 34
Crissy Field 20
groundwater monitoring 17
soil excavation 17
soil removal 17
field sampling plan 12
historic preservation 12
obsolete 12
Fuel Distribution System 10
Building 1065 8
Building 937 8
land use 8
land use controls 8
transportation 8
Baker Beach 7
Doyle Drive 7
archaeology 7
corrective action plan 7
history 7
natural resources 7
soil sampling 7
cultural resources 6
geology 6
housing 6
Building 207/231 Area 5
Former Motor Pool 5
Presidio Consolidated Motor Pool 5
Tennessee Hollow Riparian Corridor 5
air quality 5
small arms firing ranges 5
visual resources 5
Baker Beach Disturbed Area 3 4
Baker Beach Disturbed Area 4 4
Building 1065 Area 4
Building 1349 4
Building 207 4
Building 207/231 area 4
Building 230 4
Building 231 4
Building 271 4
Building 38 4
Building 610 4
Commissary and Main Post Exchange 4
Commissary/Post Exchange 4
Crissy Marsh 4
Environmental remediation 4
Fill Site 6A 4
Landfill E 4
Lobos Creek 4
Machine Gun Butt 4
hazardous materials 4
mitigation measures 4
new construction 4
noise 4
underground storage tanks 4
vapor intrusion assessment 4
Barnard Avenue Protected Range 3
Battery East 3
Building 208 3
Building 38-A 3
Building 933 3
California Highway Patrol Pistol Range 3
Gorgas Avenue 3
Lobos Creek Protected Range 3
Lobos Creek Target Butt 3
Main Post 3
Operable Unit 3 3
Tennessee Hollow creek system 3
Water Recycling Project 3
backfill 3
built space 3
cultural programs 3
educational programs 3
environmental impact 3
financial analysis 3
freshwater restoration 3
geoarchaeology 3
groundwater sampling 3
historic resources 3
hydrology 3
indoor air assessment 3
indoor air sampling 3
indoor cap assessment 3
lodging 3
outdoor cap assessment 3
remedial action plan 3
schools 3
subslab vapor sampling 3
Baker Beach Disturbed Area 1 2
Baker Beach Disturbed Area 2 2
Battery Caulfield alternative 2
Building 1063 2
Building 215 2
Building 228 2
Building 340 2
Building 637 Area 2
Building 649 2
DTSC 2
Golden Gate/Fort Point Planning District 2
Infantry Terrace 2
Infantry Terrace (FDS Section MT-14) Area 2
Parade Ground 2
Remediation 2
Sibert Loop 2
addendum 2
alternatives 2
analysis methodologies 2
biological resources 2
changes to the EIS 2
design guidelines 2
environmental assessment 2
environmental mitigation 2
environmental protection 2
erosion control 2
field sampling 2
landfills 2
landscape restoration 2
lead abatement 2
lead contamination 2
native plant revegetation 2
open space 2
planning guidelines 2
plant restoration 2
preferred alternative 2
programmatic agreement 2
remedial investigation report 2
resource preservation 2
soil gas sampling 2
soil recycling 2
sustainable design 2
utilities and services 2
vegetation management 2
vision statement 2
visitor experience 2
visitor use 2
water quality 2
wetlands 2
wetlands restoration 2
work plan 2
38 Garage 1
38-A 1
AST 970/Building971 Area 1
Aboveground Storage Tank 970 1
Alternative 5 selected 1
Area B 1
Baker Beach Disturbed Area 1A 1
Baker Beach Disturbed Area 2A 1
Battery Boutelle 1
Battery Caulfield 1
Battery Caulfield Road 1
Battery Crosby 1
Battery Crosby Road 1
Battery Dynamite 1
Battery Godfrey 1
Battery Howe-Wagner 1
Battery Marcus Miller 1
Battery Saffold 1
Bay Area Ridge Trail 1
Building 10 1
Building 100 1
Building 1040 1
Building 1167 1
Building 119 1
Building 1349 Area 1
Building 201 1
Building 202 1
Building 203 1
Building 206 1
Building 207/231 1
Building 228 Remedial Unit Corrective Action 1
Building 229 1
Building 230 Excavation Water Utility Plan 1
Building 230 Remedial Unit Corrective Action 1
Building 231 Excavation Water Utility Plan 1
Building 231 Remedial Unit 1
Building 637 1
Building 9 1
Building 900s Area 1
Building 923/937 Area 1
Building 970 1
Building 970/971 Area 1
Building 971 1
Building 979 Area 1
Cavalry Stables 1
Coastal Trail 1
Community center 1
Corrective Action Plan 1
Crissy Field Groundwater Area 1
Crissy Field Operable Unit 4 1
Crissy Field Planning District 1
Cultural Resources 1
DEH 1
Design Guidelines 1
Directorate of Engineering and Housing Area Operable Unit 1
Directorate of Engineering and Housing Operable Unit 1
Dragonfly Creek 1
Ecology Trail 1
LANGUAGE
English 109
SHOW DETAILS
up-solid down-solid
eye
Title
Date Published
Creator
Presidio Trust Library
texts
eye 2,046
favorite 0
comment 0
This Corrective Action Plan (CAP) has been prepared to evaluate and select corrective action alternatives to address soil and groundwater contamination at the Building 1065 Area, Presidio of San Francisco, California. This CAP addresses contamination that is related to or co-located with releases of petroleum hydrocarbons from past use of the site. Remedial actions selected will be those that are protective of human health, the environment, and groundwater quality, are cost-effective, allow...
Topics: environmental remediation, Building 1065, Building 1065 Area, Building 1063, soil contamination,...
Presidio Trust Library
texts
eye 1,947
favorite 0
comment 0
Land Use Policies for Area B of the Presidio of San Francisco
Topics: Cultural Resources, Natural Resources, housing, Lodging, built space, new construction, cultural...
This corrective action plan encompasses the vicinity of the current Commissary and Main Post Exchange (Commissary/PX) also know as the Former Motor Pool. It has been prepared to evaluate potential remedial alternatives to address adverse effects of the release of petroleum-related contamination and to select corrective action for implementation at the Commissary/PX Study Area.
Topics: environmental remediation, Commissary and Main Post Exchange, Commissary/Post Exchange, Former...
Presidio Trust Library
texts
eye 1,523
favorite 0
comment 0
This Corrective Action Plan has been prepared to evaluate and select corrective action alternatives for soil and groundwater at the Building 207/231 Area where residual petroleum hydrocarbons and petroleum-related chemicals occur from past use of the Site by the Army for servicing and fueling vehicles. This CAP summarizes data from all previous and current investigations conducted within the Site, identifies where residual contamination still occurs above cleanup levels, and evaluates,...
Topics: Environmental remediation, Building 207/231 area, soil contamination, groundwater contamination,...
Presidio Trust Library
texts
eye 1,441
favorite 0
comment 0
This Construction Completion Report was prepared to document the implementation of the selected alternative of Fill Site 6A, consisting of excavation and removal of polychlorinated biphenyl- and metal- contaminated fill soils and ebris; segregation of uncontaminated soil and debris for recycling as practicable; and offsite disposal of contaminated soils and debris. Planned restoration activities included creating an open channel in place of an underground 72-inch diameter storm drain and...
Topics: environmental remediation, Fill Site 6A, soil contamination, soil excavation, soil recycling, soil...
This document includes all of the substantive comments received through letters and public hearings following the release of the Draft Environmental Impact Statement and Planning Guidelines for New Development and Uses within the Letterman Complex in April 1999, and responses to the comments. This document, together with new analysis, information, and changes made in response to comments as reflected in the accompanying revised Draft EIS, will be filed as the Final EIS. The Final EIS is a...
Topics: National Environmental Policy Act, National Historic Landmark, programmatic agreement
This report covers the Presidio-Wide Quarterly Groundwater Monitoring Program during the First and Second Quarters 2007.
Topics: environmental remediation, groundwater monitoring, obsolete
On behalf of the Presidio Trust, MACTEC Engineering and Consulting, Inc. prepared this Corrective Action Implementation Work Plan to implement the corrective actions at five remedial units proposed in the Building 207/231 Area Final Corrective Action Plan, Building 207/231 Area, San Francisco, California. The Building 207/231 Area comprises approximately 8 acres of land in the northeast portion of the Presidio of San Francisco, located south of the Crissy Marsh. Doyle Drive/Highway 101 north-...
( 1 reviews )
Topics: Environmental remediation, Building 207/231 Area, groundwater contamination, soil contamination,...
Volume 1 Corrective Action Implementation Work Plan
Topics: Remediation, Building 228 Remedial Unit Corrective Action, Building 230 Remedial Unit Corrective...
The purpose of this work is to confirm that no Chemical Agent Identification Set materials or Chemical Warfare Material residues are present within the Presidio of San Francisco. The CAIS materials could include mustard,lewisite, phosgene, and chloropicrin. However, mustard is the most persistent agent of those commonly used for training and is therefore the focus of this investigation.
Topics: environmental remediation, chemical warfare materials, chemical warfare training, Baker Beach,...
This Completion Report describes field activities and results of final confirmation sampling for a soil excavation program that was conducted at the Building 1065 Corrective Action Plan Area, Presidio of San Francisco, California as part of a Phase I Interim Action (IA). The Phase I IA was performed to reduce exposure to construction workers and implement cleanup prior to construction of the Presidio Trustâs Water Recycling Project at the Building 1065 CAP Area.
Topics: environmental remediation, Building 1065, Building 1065 Area, soil contamination, soil excavation,...
Between 7 December 2005 and 23 February 2006, construction of the new access road to Battery Crosby was performed. This report summarizes the reconstruction of Battery Crosby Road following remedial excavation activities performed at former Baker Beach Disturbed Area 3 (BBDA3) located in the Presidio of San Francisco, California. This report has been prepared as an addendum to the Trustâs Construction Completion Report, Baker Beach Disturbed Areas 3 and 4 (Treadwell & Rollo, 2005) dated...
Topics: environmental remediation, Baker Beach, Battery Crosby, Baker Beach Disturbed Area 3, Baker Beach...
Presidio Trust Library
texts
eye 1,017
favorite 0
comment 0
This forest management plan was prepared as a long-range management tool for army operation of the Presidio of San Francisco. The plan was developed with the cooperation and assistance of the staff of the Golden Gate National Recreation area. A process of public review and comment on a draft plan was planned along with coordination of an enviornmental document before the plan was finalized and adopted. The process of developing and adopting the forest management plan was terminated at the draft...
Topics: forest management, vegetation management, vegetation history, presidio site conditions, wind,...
Presidio Trust Library
texts
eye 982
favorite 0
comment 0
The Presidio Trust Feasibility Study Report for the Small Arms Firing Ranges has been completed in general compliance with applicable requirements of the National Oil and Hazardous Substances Pollution Contingency Plan, and in accordance with the Presidio Trust Small Arms Firing Ranges Remedial Investigation/Feasibility Study Work Plan, as approved by the California Environmental Protection Agency, Department of Toxic Substances Control (DTSC) in its letter, dated 8 July 2003. The purpose of...
Topics: environmental remediation, Operable Unit 3, small arms firing ranges, Lobos Creek Target Butt,...
This report documents the results of a subsurface geoarchaeological survey conducted by the Anthropological Studies Center at Sonoma State University in response to a Corrective Action Plan developed by MACTEC (2005) for the Presidio Trust. This document (1) briefly describes the nature and scope of the project and the project areaâs natural setting; (2) provides a brief review of previous archaeological studies in and near the Presidio; (3) describes the historicâperiod land use within and...
Topics: Environmental remediation, Building 207/231 Area, geoarchaeology, archaeology, history,...
This EA identifies the environmental effects of the proposed Tennessee Hollow Upper Watershed Revitalization Project. The project proposed to revitalize approximately 27 acres of land within the Tennessee Hollow Watershed as one phase in an ongoing effort to transform the watershed.
Topics: tributaries, El Polin Spring, Pop Hicks Field, Julius Kahn Playground, Tennessee Hollow creek system
This is a Field Sampling Plan for a vapor intrusion assessment, which will include subslab soil vapor samples and chemical analysis from nine locations and, if needed, air samples and chemical analysis at Building 937 at the Presidio of San Franciso.
Topics: environmental remediation, Building 937, Crissy Field, soil contamination, groundwater...
Presidio Trust Library
texts
eye 722
favorite 0
comment 0
This Corrective Action Plan has been prepared to evaluate and select corrective action alternatives to address soil and groundwater contamination at the Building 1065 Area. This CAP addresses contamination that is related to or co-located with releases of petroleum hydrocarbons from past use of the site. The site, which is located in the northeast portion of the Presidio of San Francisco, was historically used for vehicle maintenance, and contained a service/gas station, garage, laundry with...
Topics: environmental remediation, Building 1065, soil contamination, groundwater contamination, obsolete
This report presents the methods and results of a vapor intrusion assessment conducted at Building 937 and additional sampling for volatile organic compounds in the subsurface at Buildings 933 and 937. This work was conducted in response to an 8 August 2005 request by the Department of Toxic Substances Control (DTSC) to conduct a vapor intrusion analysis at Building 937.
Topics: environmental remediation, Building 933, Building 937, Crissy Field, soil contamination,...
This is a field sampling plan for soil sampling and chemical analysis from 119 proposed locations along the former fuel distribution system (âFDSâ) pipeline. These sample locations are along 29 FDS sections with data gaps identified based on a review of the FDS removal report prepared by International Technology Corporation on behalf of the U.S. Army Corps of Engineers. The sampling results from these FDS sections will be compared to Presidio-specific cleanup levels and evaluated to determine...
Topics: environmental remediation, Fuel Distribution System, soil contamination, groundwater contamination,...
Presidio Trust Library
texts
eye 659
favorite 0
comment 0
This document provides new analysis, information, and changes made in response to public comments on the Draft Supplemental Environmental Impact statement for the Public Health service Hospital, which was circulated and filed in august 2004. This document, together with the accompanying Response to comments, will be filed as the Final SEIS. The Final SEIS is a supplement to and tiers from the 2002 Final EIS for the Presidio Trust Mangement Plan, the Presidio Trust's comprehensive land use plan...
Topics: PTMP alternative, Wings Retained alternative, Wings removed alternative, Battery Caulfield, Park...
Presidio Trust Library
texts
eye 650
favorite 0
comment 0
maintaining a rich tapestry of natural and historic landscapes at the Golden Gate, Summer 1999
Topics: Native plant communities, degraded areas, historic forest, landscape vegetation
Presidio Trust Library
by Golden Gate National Recreation Area, United States Department of the Interior/National Park Service, The Presidio Trust
texts
eye 607
favorite 0
comment 0
The scope of this plan addresses all vegetation within the Presidio--both native plants and species introduced as landscaping.
Topics: native plant communities zone, historic forest management zone, soil erosion and control, fire...
This Crissy Field Implementation Report was prepared to document remedial actions and request closure certification for the Crissy Field sites. This report also includes an assessment for each of the sites for unrestricted land use.
Topics: environmental remediation, Crissy Field Operable Unit 4, Crissy Field, Building 933, Building 937,...
A Corrective Action Implemenation Work Plan to implement corrective actions at five remedial units in the Building 207/231 Area, which comprises approximately 8 acres of land in the northeast portion of the Presidio located south of the Crissy Mars. Doyle Drive/Highway 101 north- and south-bound overpassess bisect the site. The purpose of the corrective actions are to achieve âclean closureâ for unrestricted reuse of the Site. Five different soil RUs and four co-located groundwater RUs...
Topics: environmental remediation, Building 207/231 Area, Building 207, Building 208, Building 38, Building...
Presidio Trust Library
texts
eye 554
favorite 0
comment 0
Using the information obtained during the various site investigation and corrective action activities, this Draft corrective action plan was prepared to evaluate potential remedial alternatives to address adverse risks due to the release of petroleum related chemicals and select corrective actions for implementation at the Study Area. The corrective actions selected under this CAP are intended to protect human health, safety, and the environment and protect current and potential beneficial uses...
Topics: environmental remediation, Building 1349, soil contamination, groundwater contamination, petroleum...
On behalf of the Presidio Trust, MACTEC Engineering and Consulting, Inc. prepared this Corrective Action Implementation Work Plan (Work Plan) to implement the corrective actions at five remedial units proposed in the Building 207/231 Area Final Corrective Action Plan, Building 207/231 Area, San Francisco, California (CAP). The Building 207/231 Area comprises approximately 8 acres of land in the northeast portion of the Presidio of San Francisco, located south of the Crissy Marsh. Doyle...
Topics: Environmental remediation, Building 207/231 Area, groundwater contamination, soil contamination,...
Using the information obtained during the various SI and corrective action activities, this CAP was prepared to evaluate potential remedial alternatives to address adverse risks due to the release of petroleum-related chemicals and select corrective actions for implementation at the Study Area. The corrective actions selected under this CAP are intended to protect human health, safety, and the environment and protect current and potential beneficial uses of water, to the extent possible.
Topics: environmental remediation, Building 1349, Fuel Distribution System, soil contamination, groundwater...
Presidio Trust Library
texts
eye 523
favorite 0
comment 0
The Final Remedial Action Plan (RAP) presents a summary of site investigations that identified contaminants in soil and groundwater. These contaminants include both inorganics and organics. The cleanup levels have been approved by the Department of Toxic Substances Control and are protective of human and environmental receptors. The RAP also provides a comparison of the selected remedy with the other alternatives that were evaluated. The RAP proposes source removal and remediation of soil by...
Topics: environmental remediation, Fill Site 6A, Baker Beach Disturbed Area 3, Baker Beach Disturbed Area...
Presidio Trust Library
texts
eye 518
favorite 0
comment 0
Land Use Policies for Area B of the Presidio of San Francisco, May 2002
Topics: cultural resources, natural resources, housing, lodging, built space, new construction, cultural...
Presidio Trust Library
by The Presidio Trust
texts
eye 499
favorite 0
comment 0
Land Use Policies for Area B of the Presidio of San Francisco. This plan ensures that the Presidio Trust meet the congressional mandates outlined in the Presidio Trust Act.
Topics: land use, transportation, infrastructure and facilities, planning districts, financing,...
Volume 2 Construction Documents (Technical Specifications and constructions) prepared by MACTEC Engineering and Consulting, INc.
Topics: previous soil and groundwater analytical results, demolition plan, gas utility plan, Building 230...
This Corrective Action Plan has been prepared to evaluate and select corrective action alternatives to address soil and groundwater contamination at the Building 1065 Area. This CAP addresses contamination that is related to or co-located with releases of petroleum hydrocarbons from past use of the site.
Topics: environmental remediation, Building 1065, soil contamination, groundwater contamination
The Presidio Trust has prepared this Land Use Controls Master Reference Report to serve as the implementation and enforcement plan to meet regulatory requirements and to describe the land use controls the Trust will use at the Presidio of San Francisco.
Topics: environmental remediation, land use controls, Presidio Trust Land Use Controls Master Reference...
This environmental assessment identifies the environmental effects of the Trust's proposed project within the PHSH district. The Council on Environmental Quality's regulations implementing the National Environmental Policy Act allow federal agencies such as the Trust to prepare an EA to assist agency planning and decsiion-making. An EA provides evidence and analysis to determine whether an EIS is required, aids a federal agency's complicance with NEPA when an EIS is not necessary, and...
Topics: PTMP or no action alternative, infill alternative, no infill alternative, Battery Caulfield...
The purpose of the Remedial Investigation report is to present results that define the nature and extent of contamination at five historical small arms firing ranges at The Presidio of San Francisco, California as required by the California Department of Toxic Substances Control. The results indicate that at several sample locations, contaminants of concern concentrations exceed the site-specific cleanup levels.
Topics: environmental remediation, Operable Unit 3, small arms firing ranges, Lobos Creek Target Butt,...
Presidio Trust Library
texts
eye 439
favorite 0
comment 0
This Completion Report describes activities associated with removal of U.S. Department of the Army-era landfills located at Baker Beach Disturbed Areas 1 and 2A at the Presidio of San Francisco, California. It was prepared by MACTEC Engineering and Consulting, Inc. on behalf of the Presidio Trust (Trust). The specific remedial action objectives at BBDAs 1 and 2A were to remove waste fill, impacted historic fill, and associated soil containing COCs above cleanup levels to protect human health...
Topics: environmental remediation, Baker Beach, landfills, erosion control
This Field Sampling Plan Addemdum summarizes the collected data and presents an approach to investigate the potential source of benzene, chloroform, tetrachloroethene, and trichloroethene in the subsurface at levels above the indoor air risk-based target concentrations levels.
Topics: environmental remediation, Building 937, Crissy Field, soil contamination, groundwater...
A Corrective Action Implemenation Work Plan to implement corrective actions at five remedial units in the Building 207/231 Area, which comprises approximately 8 acres of land in the northeast portion of the Presidio located south of the Crissy Mars. Doyle Drive/Highway 101 north- and south-bound overpassess bisect the site. The purpose of the corrective actions are to achieve âclean closureâ for unrestricted reuse of the Site. Five different soil RUs and four co-located groundwater RUs...
Topics: environmental remediation, Building 207/231 Area, Building 207, Building 208, Building 38, Building...
Presidio Trust Library
texts
eye 406
favorite 0
comment 0
This is a plan for soil and groundwater sampling and chemical analysis from seven location at the former Building 970/971 Area. The results of soil and groundwater sampling and chemical analysis described herein will be used to evaluate lateral and vertical extent of chemical impacts to soil and groundwater, as well as whether further remedial actions are appropriate.
Topics: environmental remediation, Building 970, Building 970/971 Area, Golden Gate/Fort Point Planning...
Figures and photographs to accompany Report of Excavation of Impacted Soil, The Presidio San Francisco, California Building 215, Lincoln Boulevard GGTR Job No. 8336 November 25, 2003
Topics: environmental remediation, Building 215, soil contamination, petroleum contamination, soil...
The Phase 1 Correction Action Plan Work Plan for the Phase 1 Area in the Commissay/Post Exchange Study Area at the Presidio of San Francisco documents plans for implementation of the corrective action recommended in the Revised Final Corrective Action Plan for the Commissary/Post Exchange Study Area. The objective of the corrective action within the Phase 1 Area is to address petroleum-affected soil that potentially poses a threat to Crissy Field Marsh and land uses within Area A.
Topics: environmental remediation, Commissary and Main Post Exchange, Commissary/Post Exchange, Former...
Presidio Trust Library
texts
eye 395
favorite 0
comment 0
This is a field sampling plan for soil and groundwater sampling and chemical analysis from fourteen locations at the former Aboveground Storage Tank 970/Building 971 Area. The results of soil and groundwater sampling and chemical analysis described herein will be used to evaluate lateral and vertical extent of chemical impacts to soil and groundwater, as well as whether further remedial actions are appropriate.
Topics: environmental remediation, Aboveground Storage Tank 970, Building 971, AST 970/Building971 Area,...
The CAP Work Plan presents the procedures for the implementation of the selected corrective action alternatives for shallow soil, deep soil, and groundwater for the Building 1349 Study Area. Corrective actions for each remedial unit were outlined in the Final Corrective Action Plan (Final CAP) for Building 1349 Study Area (BBL, 2006)
Topics: environmental remediation, Building 1349, Building 1349 Area, Fuel Distribution System,...
Land Use Policies for area B of the Presidio of San Francisco
Topics: purpose and need, environmental impact statement process, public involvement, vision, alternatives,...
Presidio Trust Library
texts
eye 387
favorite 0
comment 0
This report presents the construction work plan to remove the floor slab, floor drain, and portions of the subslab sand of Building 937 to mitigate the potential threat to human health posed by the presence of volatile organic compounds in the subslab vapor beneath Building 937.
Topics: environmental remediation, Building 937, Crissy Field, petroleum contamination, soil contamination,...
Presidio Trust Library
by The Presidio Trust, The National Park Service, Golden Gate National Parks Association
texts
eye 381
favorite 0
comment 0
To improve the health of the lake and adjacent shoreline and terrestrial environments within the 14.25-acre Project Area. This document analyzes three site plan alternatives.
Topics: land use, geomorphology and soils, water resources, biological resources, recreation and public...
Presidio Trust Library
by Clearwater Hydrology, Watershed Science, Inc., MACTEC Engineering and Consulting, Inc.
texts
eye 380
favorite 0
comment 0
This Restoration Plan describes anticipated activities for construction and stabilization of a new open channel at Fill Site 6A. The Trust plans to remove an area of contaminated fill soil and building debris located in the northeast corner of the Presidio of San Francisco consistent with regulatory requirements for hazardous substance site remediation at Fill Site 6A. During the course of the cleanup activities, the underlying utilities will be removed or relocated. Among these is a 72-inch...
Topics: environmental remediation, Fill Site 6A, soil contamination, soil excavation, soil removal,...
Using the information obtained during the various SI and corrective action activities, this CAP was prepared to evaluate potential remedial alternatives to address adverse risks due to the release of petroleum-related chemicals and select corrective actions for implementation at the Study Area. The corrective actions selected under this CAP are intended to protect human health, safety, and the environment and protect current and potential beneficial uses of water, to the extent possible.
Topics: environmental remediation, Building 1349, Fuel Distribution System, soil contamination, groundwater...
The Presidio-Wide Quarterly Groundwater Monitoring Program continued, with modifications, during the Third and Fourth Quarters 2004. Sampling occurred during the second full week of August and the second and third weeks of December 2004. Several modifications to the Presidio-wide Quarterly Monitoring Program were implemented during the Third and Fourth Quarters 2004. The majority of the changes were associated with removal of sites from the program, reductions in sampling frequency at sites...
Topics: environmental remediation, groundwater monitoring, obsolete
This report documents the abatement of lead-impacted sand fill removed from the sand pit at the Building 649 former indoor small arms firing range. Based on the sand pit construction details and observations of the empited sand pit, it appears that the lead-impacted soil was contained within the concrete box.
Topics: environmental remediation, Building 649, small arms firing ranges, lead abatement
Following the removal of the top two feet of clean surface soil, approximately 48 tons of impacted soil was removed from the excavation and properly disposed of at a Statelicensed, Class II landfill facility. The excavation cavity was subsequently backfilled and compacted, and prepared for restoration to original site conditions. The soil sample results indicated that the remaining concentrations of level of Gasoline, Diesel, and Fuel Oil hydrocarbon constituents were non-detectable and that...
Topics: environmental remediation, Building 215, soil contamination, petroleum contamination, soil...
Presidio Trust Library
texts
eye 356
favorite 0
comment 0
an updated plan for Area B of the Presidio of San Francisco
Topics: natural resources, cultural resources, recreational resources, visitor experience, community,...
Presidio Trust Library
texts
eye 354
favorite 0
comment 0
The ROD documents the decision and rationale for adopting the Presidio Trust Managment Plan, Land Use Policies for Area B of the Presidio of San Francisco. The ROD also provides background about the Trust and the planning effort, and describes the alternatives considered, public involvemnet, agency consultation, mitigating measures developed to avoid or minimize environmental impacts of the selected alternative, and use of the final EIS in subsequent decision making.
Topics: Record of Decision, Presidio Trust - history, planning guidelines, design guidelines
Presidio Trust Library
texts
eye 335
favorite 0
comment 0
Investigation activities were performed to address data gaps identified from review of chemical, hydrogeologic, and historical data collected during previous investigations. Previous investigation results indicated that soil and shallow groundwater in specific areas had been affected with petroleum hydrocarbons and other related chemicals. These data gaps needed to be addressed to further characterize the nature and extent of soil and groundwater contamination at the Site and provide additional...
Topics: environmental remediation, Building 207/231 area, Building 38, Building 207, Building 208, Building...
Presidio Trust Library
texts
eye 321
favorite 0
comment 0
These guidelines provide a planning and design framework for new construction and landscaping on the 23-acre site, identified in Figure 1. They also apply to undertakings that fall short of new construction, such as site improvements and historic building rehabilitation, for the 60-acre Letterman Complex.
Topics: Letterman Complex, Letterman Hospital, planning guidelines, design guidelines, sustainable design,...
Presidio Trust Library
texts
eye 320
favorite 0
comment 0
This Corrective Action Implementation Work Plan was prepared to implement the corrective actions identified in the Final Building 1065 Area Corrective Action Plan to address soil and groundwater contamination at the Building 1065 Area, Presidio of San Francisco, California. The activities described in this Work Plan identify the fieldwork components of implementing the corrective actions to address soil and groundwater contamination that is related to or co-located with releases of petroleum...
Topics: environmental remediation, Building 1065, soil contamination, groundwater contamination, obsolete
This plan outlines proposed groundwater sample collection methodologies to assess whether there has been a release to groundwater following the abatement of lead impacted sand fill at the Building 649 Small Arms Firing Range. It proposes collection of a groundwater grab sample from below the former sand pit. The groundwater grab sample will be analyzed for dissolved metals including the five small arms firing range contaminants of concern: lead, antimony, copper, barium, and zinc.
Topics: environmental remediation, Building 649, small arms firing ranges, groundwater sampling, field...
In accordance with the Presidio Trust Act as amended and as guided by the Presidio Trust Management Plan, the Presidio Trust is proposing to rehabilitate and reuse buildings within the 42-acre Public Health Service Hospital district of the Presidio, to reintroduce residential uses to the district, and to undertake related site improvements
Topics: requested no action alternative, Presidio Trust Managment Plan alternative, wings retained...
This Addendum to the Field Sampling Plan - Former Fuel Distribution System Closure Phases II and III an the Presidio of San Francisco dated 27 April 2007 has been prepared in response to comments and requests made during the 27 February 2007 FDS Closure Program meeting. Additional soil sampling and groundwater monitoring well installation proposed at the Infantry Terrace (FDS Section MT-14) Area is in keeping with the decision logic developed for data gap analysis at former FDS Sections as...
Topics: environmental remediation, Fuel Distribution System, Infantry Terrace, Sibert Loop, Infantry...
Presidio Trust Library
by The Presidio Trust
texts
eye 294
favorite 0
comment 0
Record of Decision Final Environmental Impact Statement Planning Guidelines for New Development and Uses on 23 Acres within The Letterman Complex
Topic: Alternative 5 selected
Presidio Trust Library
texts
eye 291
favorite 0
comment 0
This Remedial Action Plan documents the selected remedial actions for Fill Site 6A, Baker Beach Distrubed Area 3, and Beker Beach Disturbed Area 4 and is based on the remedies recommended for these three sites in the Revised Feasibility Study, Main Installation Sites (Erler & Kalinowski, Inc., 2003).
Topics: environmental remediation, geology, hydrogeology, remedial action plan, Fill Site 6, Fill Site 6A,...
Presidio Trust Library
by Moore Iacofano Golstman, MIG
texts
eye 280
favorite 0
comment 0
Summary Report of conference whose purpose was to develop unifying concepts for the interpretation of the Presidio. It extended the work begun by the General Management Plan Amendment of 1994, the Long Range Interpretive Plan of 1998 and the focus groups convened in 2000, April 12-15, 2000.
Topics: military history, crossroads of culture, restoring natural systems, changing landscapes,...
This draft corrective action plan encompassess the vicinity of the current Commissary and Main Post Exchange (Commissary/PX) also known as the Former Motor Pool. It has been prepared to evaluated potential remedial alternatives to address adverse effects of the release of petroleum-related contamination and to select corrective action for implementation.
Topics: environmental remediation, Commissary and Main Post Exchange, Commissary/Post Exchange, Former...
Presidio Trust Library
texts
eye 256
favorite 0
comment 0
This plan proposes additional soil sampling at the Machine Gun Butt site to address data gaps necessary to proceed with the Remedial Action Plan for the site. The results of soil sampling and chemical analysis described will be used to assess whether potential chemicals of concern previously detected in shallow soil at the site are actually presnet at levels that warrant remedial action.
Topics: environmental remediation, Machine Gun Butt, Crissy Field Planning District, soil contamination,...
Presidio Trust Library
texts
eye 252
favorite 0
comment 0
This plan addresses the overarching goals for which the Presidio Trust was created: to transform an historic military post into a park, to preserve and enhance its resouces, and to support it with revenue from leasing its buildings. The Trust's preservation efforts encompass the natural areas, wildlife, and native habitats of the park, as well as the historic structures and designed landscapes that distinguish the Presidio and make it a National Historic Landmark District.
Topics: strategic plan, strategic goals, historic preservation, environmental protection, sustainability,...
Presidio Trust Library
texts
eye 249
favorite 0
comment 0
Technical report to request closure certification for underground storage tanks, aboveground storage tanks, and fuel delivery system pipelines following completion of removal and remedial actions. Based on the remedial activities conducted at the Building 637 Area and as documented by soil and groundwater sampling results, the Trust concludes that cleanup levels and remedial goals have been met such that no further corrective actions or soil or groundwater monitoring are needed, and that the...
Topics: environmental remediation, Building 637, Building 637 Area, Crissy Field, completion report, soil...
This report consists of a description of the emergent chemical groundwater sampling program conducted at the request of the Regional Water Quality Control Board. The emergent chemical groundwater sampling program was developed to determine if past uses at the Presidio resulted in groundwater contamination associated with emergent chemicals identified as perchlorate, N-nitrosodimethylamine, 1,4-dioxane, 1.2.3-trichloropropane, hexavalent chromium, and polybrominated diphenyl ehter. Groundwater...
Topics: environmental remediation, emergent chemicals, groundwater contamination, groundwater sampling,...
This FSP Addendum has been prepared in response to comments and requests made during the 9 October 2007 Landfills 8 & 10 FSP stakeholder review meeting. At that time, the stakeholders agreed that trenching for Landfill 10 edge definition should be added to the planned field program at Landfills 8 & 10.
Topics: environmental remediation, Landfill 8, Landfill 10, trenching, boundary definition, soil...
Presidio Trust Library
by The Presidio Trust
texts
eye 237
favorite 0
comment 0
This environmental assessment evalues the proposed action and two alternatives for the rehabilitation, leasing, and occupancy of Building 35 for office space. Building 35 is one of the largest historic buildings at the Presidio and among the most expensive within the park to rehabilitate.
Topics: historic preservation, financial viability, environmental assessment, Building 35
This report presents a redefinition of site boundaries for Fill Site 6B and the approach and rationale for a soil sampling investigation in support of site characterization activities.
Topics: environmental remediation, Fill Site 6B, soil sampling, Remedial Action Plan 5, work plan, obsolete
Presidio Trust Library
by Erler & Kalinowski, Inc.
texts
eye 237
favorite 0
comment 0
Location is Area B, at Crissy Field south of former Building 637. The Machine Gun Butt {MGB] was used as a firing range during the late 1930s and early 1940s. Historically, the MGB was designated as Structure 635 and encompassed an area of approximately 50 feet by 50 feet. According to Montgomery Watson (1997), the site was used to fire machine guns from a position north of the slope south towards targets placed at the base of the slope. The bedrock slope may have served as a backstop, or berms...
Topics: Soil, field sampling, Building 637 Area, no significant contaminant impacts found
This Work Plan addresses the assessment of potential vapor intrustion to indoor air, assessment of the building slab which is serving as a cap to limit potential exposure to residual petroleum hydrocarbons beneath the building, and review of needs for potential improvements to the cap.
Topics: environmental remediation, Building 1040, Building 1065, power plant, soil gas sampling, air quality
Presidio Trust Library
by National Park Service, The Presidio Trust
texts
eye 224
favorite 0
comment 0
The Trails Planis intended to improve the quality of visitor experience at the Presidio while protecting and enhancing park landscapes and resources. Three action alternatives are being considered in the Plan, in addiiton to a "no action" alternative.
Topics: visitor use and experience, resource preservation, comprehensive transportation strategy,...
A supplement to the 1994 General management Plan Amendment Environmental Impact Statement for the Presidio
Topics: The Presidio Trust Act, self-sufficiency, demolition of the medical center, social programs,...